24 in stock - Ready to be shipped

(0)

Autzen Stadium (University of Oregon)

$18.00

Tax not included.
Shipping calculated at checkout.

Product Base price with no add-on options

Pen-blanks

Product Price with any add-on options selected

$18.00

Authentic Stadium Materials

Certified Provenance (COA)

Stabilized for Performance

Limited & Irreplaceable Drops

Wooden seat pen blanks!

Blanks are 1â" x 3/4"

All blanks will come with one COA per blank. COAs are 4" x 6" card stock with silver foil embossed COA seal.

All blanks are cut as they are ordered.

------------------------------------------------------------

Autzen Stadium is an outdoor football stadium in the northwest United States, in Eugene, Oregon. Located north of the University of Oregon campus, it is the home field of the Oregon Ducks of the Pac-12 Conference. Opened 53 years ago in 1967, the stadium has undergone several expansions. The official capacity is 54,000. However, attendance at the stadium regularly exceeds 54,000.

Prior to 1967, the Ducks' on-campus stadium was Hayward Field, which they shared with the track and field team. However, by the late 1950s, it had become apparent that Hayward Field was no longer suitable for the football team. It seated only 22,500 people, making it one of the smallest in the University Division (now Division I), and only 9,000 seats were available to the general public. While nearly every seat was protected from the elements, it had little else going for it. The stadium was in such poor condition that coaches deliberately kept prospective recruits from seeing it. As a result, the Ducks only played three home games per year on campus in most years; with the exception of the Civil War, the annual rivalry game with Oregon State, games that were likely to draw big crowds (against schools like Washington and USC) were played 110 miles (180 km) north in Portland at the larger Multnomah Stadium. With the recognition that the football team had outgrown the campus facility and with popular support to play the entire home schedule in Eugene for the first time in school history, Oregon athletic director Leo Harris led a campaign to build a new stadium on 90 acres (0.36 km2) that the school had acquired for the purpose in the 1950s on his recommendation.

The stadium, designed by Skidmore, Owings & Merrill,[5] was built within an artificial landfill (over the refuse) to eliminate the need for multilevel ramps. As a result, construction took just nine months and cost approximately $2.3 million.[5] $250,000 was contributed by the Autzen Foundation, headed by Thomas E. Autzen (class of 1943), son of Portland lumberman and philanthropist Thomas J. Autzen (1888–1958), for whom the stadium was named. The elder Autzen was ironically an alumnus of Oregon archrival Oregon State University.

In 1967, Oregon hosted Colorado in Autzen Stadium's inaugural game, a 17–13 loss before 27,500 on September 23.[10] Four weeks later on October 21, 16,000 saw Oregon's first win in the new facility; the 31–6 victory over Idaho was the only home win of the season.

The stadium alternates with Oregon State's Reser Stadium as host of the Civil War game.

Autzen hosted the inaugural Pac-12 Conference Championship game on December 2, 2011, as the Pac-12 North champion Ducks defeated the Pac-12 South champion UCLA Bruins.

Transform your blanks into showstoppers with these pro-level insights. Our upgraded V2 blanks boast finer shredded plastic for ultra-smooth turning and minimal chip-out— a game-changer over V1. Dial in sharp carbide or HSS tools, crank speeds to 2,000–3,000 RPM, and take feather-light cuts (0.005–0.015 inches) to dodge melting or gummy buildup. Wet-sand from 220 to 2,000 grit, zap pin-holes with thin CA glue, and crown it with Magic Juice polish for that mirror-finish glow. Dive deeper with our guides:

Share information about your brand with your customers. Describe a product, make announcements, or welcome customers to your store.

2-5 business days standard; Full Blocks take 2-3 weeks. Free Ground Shipping on $200+ orders—otherwise calculated at checkout. Unopened returns? 30 days, no sweat.

30-day unused products can be returned for full purchase price of the item. (Does not include shipping).

Pay with

  • Amazon
  • American Express
  • Diners Club
  • Discover
  • Mastercard
  • Shop Pay
  • Visa

Your transaction is protected with advanced security measures to keep your information confidential

Autzen Stadium (University of Oregon)

$18.00

$18.00

Why Customers Trust Us

Verified Provenance You Can Trust

Every eligible blank comes with a professionally designed Certificate of Authenticity, setting the industry standard for documentation and collectible value.

Craft-Ready, Maker-Approved Quality

From stabilization to cutting and finishing, each blank is meticulously prepared to deliver consistent results on the lathe and in the workshop.

Tools, Supplies & Materials—All in One Place

We offer a full ecosystem of products: HDPE molds, casting supplies, mica powders, finishing solutions, and premium turning tools—everything artisans need, from blank to final polish.

A Brand Built by Makers, for Makers

With decades of woodworking and turning expertise, we know what artisans expect—and we deliver materials and tools that elevate every project.

Recently Products Viewed

We transform authentic historic fragments from iconic stadiums, ships, aircraft into premium, one-of-a-kind writing instruments
that preserve the stories behind them.